av天网堂在线观看 I 欧美性日韩 I 国产精品爆乳在线播放第一人称 I 成人在线高清视频 I 天堂av无码av在线a√ I 日日不卡av I 色交视频网站 I 久久蜜桃av一区精品变态类天堂 I 久久精品无码一区 I gogo人体做爰大胆裸体网站 I 五月激情六月综合 I 天天操人人爱 I 免费日韩成人 I 亚洲最新无码成av人 I 少妇淫真视频一区二区 I 久久久精品福利 I 国产精品伦理一区 I 麻豆福利视频 I www.国产一区 I 国产精品久久久久久久久婷婷 I 五月天av在线 I 天天干天天天 I 国产在线精品视频 I 欧美少妇15p I 弄得好舒服快高潮了 I 国产乱了高清露脸对白 I 91精品一区二区三区蜜桃 I 在线黄色av电影 I 午夜福利三级理论电影 I 日本麻豆 I 91嫩草人人 I 欧美黑白配在线 I 国产成人8x视频网站入口 I 午夜视频在线观看免费观看1 I 天天躁日日躁狠狠躁人妻 I 成人写真视频福利网 I 国产羞羞视频在线观看免费应用 I 人妖精品videosex性欧美 I aaaa级黄色片 I 日本黄色片aaaa I 欧美色影院 I 色狠狠五月天 I 精品少妇一区二区三区密爱 I 亚洲成a∧人片在线播放无码 I 福利网在线 I 女人大p毛片女人大p毛片 I 国产欧美一区二区白浆黑人 I 色先锋影音岛国av资源 I 欧美日韩一区二区视频观看 I 天天综合婷婷 I 日韩伦理中文字幕 I 久久视频这里有久久精品视频11 I 很黄很污的视频网站 I 亚洲人成无码网站 I 超碰免费视 I 成人午夜免费在线视频 I 大插入

Contact Us

Micro Cooling Fan of the installation process

Date: 2015-7-31   Click: 1724 Times

       Check again before installation fans all parts are in good condition, otherwise it should be repaired; 1. Read "Micro Cooling Fan" operating instructions and product samples, knowledge and understanding of the fan size, form, orientation and air flow in and out of the impeller rotation direction .
       2. The fan must have safety devices to prevent accidents during installation by professionals familiar with the relevant safety requirements of the installation and wiring.
       3. To join the fan duct with a separate import and export support, not allowed to add the weight of the pipe overlapping parts on the blower; wind turbine installation should pay attention to the horizontal position of the fan, the fan and the foundation coupled combination of surface and out of the wind pipe should adjust it so natural fit, not be forced to join.
       4. "Micro Cooling Fan" After installation, hand or lever toggle wheel, check if there are too tight or collision, the availability interfere with the rotation of items, with no anomalies, commissioning can be carried out, the fan drive device the exposed part should guard (user) as the fan inlet is not connected to the pipeline, but also need to purchase fencing or other mounting device (user-supplied).
       5. Fan the distribution control box must match the corresponding fan (of power, voltage, pneumatic control forms, etc.).
       6. The fan wiring by a qualified electrician wiring, wiring must be correct and reliable, especially numbered wiring consistent numbering fan electrical control box at the terminal on the fan housing should be reliable grounding must be reliable, not a substitute for ground zero connection .
       7. "Micro Cooling Fan" installation should be checked after all internal fans have a legacy tool box debris.

Back to: Industry news

+86-0769-83660708

Home Product News Contact

主站蜘蛛池模板: 乐都县| 库车县| 武穴市| 新晃| 绥芬河市| 沙湾县| 普宁市| 武清区| 紫阳县| 富顺县| 闸北区| 建阳市| 中方县| 易门县| 德令哈市| 新民市| 乡城县| 威信县| 花垣县| 化州市| 蓬溪县| 东阿县| 顺昌县| 三河市| 江源县| 开鲁县| 黄大仙区| 太白县| 洪江市| 黑河市| 舟曲县| 德阳市| 三都| 防城港市| 盐城市| 石棉县| 泽普县| 白河县| 弥勒县| 武隆县| 甘孜县|